PARK GATE

Details
Object PARK GATE
Investor Mane TCI
Role of Ales Construction Main contractor of works for the reinforced concrete structure
Location "Elbasan" street
Construction area 18322,7m2
Construction Start July 2016
Construction End September 2017
Description

Park Gate is a multifunctional center at the entrance of Tirana, including 2-7-13 floors of residential and utility space and two underground parking floors. The building rises to 13 floors on the east side and seven floors on the west side. It is ecological with green terraces, covered with a ventilated facade and 3-color ceramics.