PARK GATE

Details
Object PARK GATE
Investor Mane TCI
Role of Ales Construction Main contractor of works for the reinforced concrete structure
Location "Elbasan" street
Construction area 18322,7m2
Construction Start July 2016
Construction End September 2017
Description

Park Gate stands out as a distinctive building, showcasing a special blend of architectural and structural styles. The facility is composed of a combination of structures; rising to a height of 13 floors in the east and south, and reaching 7 floors from the west and north. With green terraces in line with the latest trend of ecological terraced buildings and a customized 3-color facade, ‘Park Gate’ offers a unique aesthetic.

The building comprises 2 service floors, residential floors on the 7th and 11th levels, as well as 2 underground parking floors.